Projects

Under the label "BESS 50" (Battery Energy Storage System) a 50kWh Lithium Ion Battery was developed which is tested in combination with a 20kW Photovoltaic generator. The public presentation of the prototype will take place in the 2nd Quarter 2013.

After some months of operational testing, a field proving under worst conditions will take place on a small south European island.

The second step is the intention of distribution and serial production of Lithium ion batteries with a capacity of 50-250 KWh.

Applications

Block diagram template